Treating water from the Colorado, Salt and Verde Rivers through the Central Arizona Project to meet or exceed water quality and safety regulations.
The project included the Chemical System modification and upgrades at the existing 24th Street Water Treatment Plant originally built in 1952.
preconstruction & design assist
current
We provide electrical construction solutions that can serve the life of a building with commitment to safe and quality services backed by our strong history of successful projects.