Ludvik Electric Co. furnished the millwright labor and electrical labor and material to install baggage conveyors, power, control devices and wiring.
The Orlando International Airport Baggage Handling System included:
The removal of two existing recode stations and installation of new recode conveyors and controls to the existing main lines.
The installation of four new Sort Piers to existing main lines and two new Run Off pieers.
Modification of existing control panels, addition of new hardware, and re-wiring existing panels internally, while ensuring service to existing conveyor lines is uninterrupted.
current
current
design build
baggage handling systems
We provide electrical construction solutions that can serve the life of a building with commitment to safe and quality services backed by our strong history of successful projects.