The 6,500 ft. Automated Guideway Transportation System and Baggage Handling Tunnels connect the Main Terminal to Concourses A, B, and C.
The system of tunnels incorporates 2 automated passenger trains, carrying approximately 8,500 commuters hourly and baggage transportation trains.
All trains reverse at the terminal and are operated automatically.
The system includes the Maintenance Facility, LED Displays and Audio-System.
current
current
design build
baggage handling systems
We provide electrical construction solutions that can serve the life of a building with commitment to safe and quality services backed by our strong history of successful projects.