The EchoStar Data Center facility has 25,000 sq ft of raised computer room floor with 150 ea 120/208 power panels to support the owner equipment. This is backed up by 4 UPS systems and 5 ea 2000kW generators. All loads have separate A/B feeds starting at the incoming service through the individual power panels. There is also the central plant with 4 ea chillers, 4 ea cooling towers and the associated pumps. There is a total of 750,000 ft of copper wire and conduit. In the data room LE installed an Auxiliary support system and approximately 6,500 of cable tray.
In addition Ludvik installed security, sound, fire alarm, lighting, lighting control, convenience power and the FMS monitoring system throughout the building including the administration area.
The generator building and the Guard building are stand alone structures adjacent to the new data center.
special projects
We provide electrical construction solutions that can serve the life of a building with commitment to safe and quality services backed by our strong history of successful projects.