This project is a Tier III Mission Critical Facility. 200 MVA of normal power to the Data Center is fed from a Utility Substation. However, due to the extremely critical nature of this Data Center a substantial alternative source of power was required in case of Utility loss. This alternative power is supplied by multiple Diesel Reciprocating Generators. All of the generators as well as the required Distribution and Paralleling Gear were furnished and installed by Ludvik Electric Co.
The buildings included industrial installations, vehicle, security, and data operations. The site was over two miles long and one mile wide.
Other responsibilities of Ludvik included special systems, SCADA, and extensive exterior lighting.